Axle pin part S.G. Iron Casting for Windmill Turbine
Employees using world-class laser equipment for the inspection of tower flange flatness.
Metro bogie chassis provided by Premier Ltd., state-of-the-art engineering facility

Overview

Premier's engineering division provides a one-stop solution for heavy engineering parts of wind energy sector, thermal energy sector, railways, mining and other infrastructure sectors.

  • Bogie frames for rail/metro rails.
  • Thermal power plant, coal pulverizing mill, heavy gearbox casings and other parts such as bearing housing cover, output flange and torque arm.
  • Heavy components for mining and construction equipment such as crusher frames for various capacities.
  • Wind turbine steel and forging parts for various capacities of wind turbines ranging from 800KW to 2.6MW like steel parts e.g. stator carrier, disc rotor, rotor, stator ring supporting structure, brake disc, stator base frame, rotor frame, generator front plate and forging parts such as stator front flange and main bearing press ring.
  • Wind turbine casting parts machining for various capacities such as main frame, hub, axle pin and blade adaptors
  • Windmill tower manufacturing.

Premier's engineering division has been catering to the needs of various industry sectors in the domestic and overseas markets and has emerged as one of the leading manufacturers in the industry.

We are currently actively exporting wind turbine parts to the European market with strict vigilance to quality and commitments.

“What sets us apart is our keen focus on growth by investing in infrastructure for long term, critical and heavy jobs with a strong focus on unbeatable standards, quality control and productivity.” Mr. Maitreya Doshi, Chairman & Managing Director, Premier Ltd.
Milestones & Achievements
  • 2011
  • 2012
  • 2013
  • 2014

2011

Our international standards have been maintained through our membership with the American Wind Energy Association (AWEA) and The European Wind Energy Association (EWEA) in 2011.

Premier manufactures its first windmill tower.

For the first time in India, Premier supplied 40 units of heavy gear housings for coal pulverizer mills to Siemens.

Delivered the 1,000th set of machining fixtures for wind turbine parts to Wind World India Ltd.

2013

Sole supplier approved by the Delhi Metro Rail Corporation (DMRC) to develop and supply 290 metro bogie chassis for the Delhi Metro.

Did you know?

The Delhi Metro has 260 trains carrying 2 lakh people daily— all supported by Premier's metro bogie chassis.

India’s first and exclusive critical heavy engineering components manufacturing facility for metro bogie chassis.

Forayed into international markets by supplying wind turbine components to Lagerwey Systems BV.

2014

“All our machines are geared to produce special, customized parts which are inherently customer-friendly. Our in-house process engineering capability gives us the scope for diverse manufacturing.” Mr. P.G. Salunkhe, Vice President, Engineering Division